This scheme is implemented where the infrastructures, township, communications, human habitations etc are threatened due to heavy erosion of river banks causing devastating destructions. It is also implemented to mitigate the floods in the rivers.
Programmes under NEC

Am. in Rs. Lakhs
Name of Scheme Approved Cost CCA, Ha Am. Sanctioned & utilized Remarks
2009-10 2010-11 Total
Themezie M.I Project at Chiechama Village, Kohima Dist. 297.44 213.00 20.00 24.44 44.44 Headworks completed, Channel works in progress
Utilization of Ground Water through Shallow Tube Well
Am. in Rs. Lakhs
Sl.No. Location of Shallow Tube Well Nos. installed Cost, Rs Am. Sanctioned & utilized Area Irrigated, Ha Remarks
2008-09 2009-10 2010-11
1 Niuland Sub-Division, Dimapur 31 28.37 11.61 0 16.76 31 Completed
2 Dhansiri Block, Dimapur 18 12.61 8.71 0 3.9 18 Completed
3 Chumukedima Circle, Dimapur 6 3.15 1.74 0 1.41 6 Completed
4 Bhagty Valley, Wokha 5 5.68 0 0 5.68 5 Completed
5 Merapani, Wokha 1 0.63 0 0 0.63 1 Completed
6 Longnak/Longtho Valley, Mokokchung 19 12.61 0 0 12.61 19 Completed
Total, Rs. Lakhs 80 Nos 63.05 22.06 0 40.99 80
Programmes under NLCPR

ii. Integrated Nguiki Irrigation Project, Peren
Am. in Rs. Lakhs
Location Approved Cost Am. Sanctioned & utilized Remarks
2007-08 2008-09 2009-10 2010-11 Total
Tenning, Nkio, Nkiolwe, Singjol 237.13 81.37 81.37 0 62.78 225.52 Under completion
iii. Tsurang Irrigation Project, Mokokchung
Am. in Rs. Lakhs
Location Approved Cost Am. Sanctioned & utilized Remarks
2007-08 2008-09 2009-10 2010-11 Total
Longtho Valley, Mangkolemba  1693.32 526.26       526.26 Headworks in progress
Contact us
Office of the Chief Engineer I&FC,
New Capital Complex, Kohima – 797001
Nagaland, India.
Telephone :
0370 - 2270923
Fax :